Key Takeways:
- An outdoor design build firm keeps design and construction under one accountable team, so nothing gets lost in the handoff between “who drew this” and “who’s building it.”
- Design-build projects are delivered faster on average than traditional design-bid-build projects, and often cost less.
If you’ve priced out a big outdoor project before, you already know the pattern. If you don’t work with an outdoor design build contractor, you hire a designer to draw up your dream space. Then you go find a contractor to build it. And somewhere between those two conversations, things start to slip: The contractor says the design won’t work as drawn, the designer says the contractor is cutting corners, and you’re the one stuck relaying the messages between two companies who’ve never met.
That back and forth is frustrating and adds risk that shows up as budget surprises and stalled timelines later. A 2018 industry study found that owners’ dissatisfaction with this separated approach, known as design-bid-build, often comes down to its adversarial structure and lack of built-in flexibility once bidding is underway.
That’s the problem an outdoor design build firm is built to solve. If you’re planning a significant investment in your property, from a full backyard renovation to a custom pool and outdoor kitchen, the way your project is delivered matters just as much as who’s holding the shovel.
What Does “Design Build” Mean?
Design build means one company designs your outdoor space and then builds it, rather than you hiring a designer and a separate contractor and hoping the two can work well together. That single point of responsibility is what sets it apart from the traditional model, where design and construction are handled by two companies with two separate contracts and no shared accountability.
| Design Build (One Firm) | Design-Bid-Build (Separate Firms) | |
|---|---|---|
| Accountability | One team, one point of contact | Split between designer and contractor |
| Pricing | Build with construction cost in mind from start to finish | Bid after design is finalized, risking mismatch |
| Timeline | Design and build phases can overlap | Sequential: Design must completely finish before bidding starts |
| Communication | One relationship to manage | You often relay messages between two companies |
| Problem-solving | The same team that designed it fixes it | Finger-pointing between designer and builder is common |
How Does Design Build Save You Time and Money?
Design build is often measurably faster and more predictable than design-bid-build. According to the Design-Build Institute of America’s 2025 Design-Build Data Sourcebook, projects delivered under the design build method are completed 102 percent faster than comparable design-bid-build projects, with 3.8 percent less cost growth from the original budget.
That speed comes from something simple: overlap. In a design-bid-build project, construction can’t start until the design is 100 percent finalized and bid out to contractors. Under design build, our team can start pricing materials, scheduling crews and even beginning site prep while final design details are still being refined, because the same company is doing both and communicating throughout the process. That overlap is also why cost growth tends to stay lower. When the people building your patio are the same people who priced it, there’s less gap between what was drawn and what it actually costs to build.
Who’s Accountable When Something Doesn’t Go As Planned?
With a design build firm, one team is accountable for your project from concept through completion, so there’s no back and forth between a designer and a contractor pointing fingers at each other. If a drainage issue turns up mid-install or a material needs to be substituted, the same team that designed the space solves the problem, because they’re the ones who have to build it right either way.
This matters most on the kind of projects where a lot of trades have to work together seamlessly:
- Retaining walls that interact with drainage
- Lighting that has to be planned before hardscape goes in
- Pools that affect grading across the whole property
When one firm owns the whole picture, those handoffs disappear for you.
What Does The Site Group’s Design Build Process Look Like?
At The Site Group, our process has three steps: Dream, Develop and Delight.
First, you’ll dream up your project by meeting with a designer, reviewing design options and solidifying the direction of your project. You’ll also get a straightforward proposal for the work, so there will be no surprises when it comes to your estimate.
Then, you move on to the build process. You’ll meet your team of professional landscapers and exceptional craftsmen who take great pride in moving projects from “before” to “after.” We’ll introduce you to your skillful, clean and friendly foreman and crew who will remain on your job from start to finish. You’ll get regular updates so you can stay up to date on your project at every turn.
Last, you’ll sit back and watch your design come to life! We make it our personal mission to finish projects on time and on budget, and can partner with you to keep your space polished, maintained and looking great throughout the years.
Choosing the Right Outdoor Design Build Partner
The biggest difference between a design build firm and hiring separately isn’t just speed or cost, though both tend to improve. It’s that you get one relationship to trust instead of two to manage. When your designer and your builder are the same team, there’s no gap for miscommunication to live in, and no one left to point fingers if something needs adjusting along the way.
If you’ve been picturing your new outdoor living space but dreading the idea of juggling multiple companies and quotes, we’d love to talk it through with you. Schedule a consultation today and let’s start dreaming together!